Cowan Recreation Centre Opens Nov. 14: Pools, Turf & a Glass Floor Coming in 2027

Kitchener’s biggest-ever recreation project is almost here. The City will officially open the Cowan Recreation Centre at RBJ Schlegel Park (1664 Huron Road) on Saturday, November 14, with a free community grand opening from 9 a.m. to 3 p.m. Here is what’s inside, what’s still pending (including the much-talked-about glass floor), and the partners and programs that round it out.

Grand opening day: what to expect

According to the City of Kitchener, opening day is a free family event. Planned activities include:

  • An official ribbon-cutting ceremony
  • Guided tours of the building, including a behind-the-scenes look at the technology under the new glass floor
  • Free public swims and sport activities
  • Bouncy castles, face painting and equipment demonstrations
  • Giveaways and prizes

Some local reports also mention free access continuing through November 22. That wasn’t confirmed in the City’s own announcement, so check Kitchener.ca before planning around it.

The facilities

The $174-million, roughly 220,000-square-foot complex is the City’s largest capital project to date, and it is expected to see more than 500,000 visits in its first year.

Two soccer teams lined up on an indoor artificial turf field
Stock photo (Pexels free licence). Not a photo of the Cowan Recreation Centre.

Indoor turf fieldhouse

A FIFA-sized indoor turf field that can be divided into four smaller fields, suited to soccer, cricket, lacrosse and futsal. An elevated walking track overlooks the turf.

Aquatics centre

An 8-lane, 25-metre competition pool and a separate warm-water program (leisure) pool, both stainless steel. They are the first public stainless steel pools in Kitchener and Waterloo Region. Viewing galleries overlook the water, and a large glass-tile mosaic by artist Jackie Traverse, Gidinawendimin (about 95 square metres), decorates the space.

Indoor swimming pool with lane dividers and starting block number six
Stock photo (Pixabay via Pexels, CC0). Not a photo of the Cowan Recreation Centre.

Quad gymnasium and Canada’s first multi-sport glass floor

The four-court gym is set up for basketball, volleyball, badminton and pickleball. It is the one part of the centre that isn’t opening on November 14: the City says the gym will be available for use in early 2027, once the floor installation is finished.

The wait is for Canada’s first multi-sport glass floor, designed and installed by ASB GlassFloor, a German manufacturer based in Bavaria. The floor covers about 1,848 square metres. The City calls it one of the largest installations of its kind in the world, and the manufacturer describes it as its third-largest worldwide.

How it works: LED lights under the glass panels project digital court lines onto the surface, and the lines can be changed at the touch of a button. Only the lines needed for the current sport show up, so there’s no clutter of overlapping painted or taped markings.

  • Sports: pickleball, basketball, volleyball, floor hockey, futsal, badminton, wheelchair basketball and wheelchair pickleball
  • Certified: by FIBA, FIVB and IHF (the international basketball, volleyball and handball federations)
  • Upkeep: no refinishing, resurfacing or regular sanding, which means less downtime and more time for programming
  • Elsewhere: the system is already used in the United States and across Europe, including Germany, Greece, Switzerland and the United Kingdom
Modern empty sports hall with basketball hoops
Stock photo (Pexels free licence). Not a photo of the Cowan Recreation Centre.

More to explore

  • Two indoor cricket practice nets (the Grow Nation Cricket Nets)
  • Multipurpose rooms for events, parties and rentals
  • Public art, including five bronze sculptures by Pierre Poussin titled Let’s Play! at the entrances
  • Accessibility features such as ramp access to both pools, wider pathways, guiding floor textures and accessible viewing areas
  • A green building design with geothermal heating and cooling, rooftop solar, mass timber and a green roof. The City is pursuing Canada’s Zero Carbon Building Standard certification

What’s still pending

  • Quad gymnasium and glass floor: expected to open for use in early 2027.
  • Regular hours, fees and memberships: We couldn’t find these published yet. Watch Kitchener.ca/RBJSchlegelPark for programming and amenity details.
  • Full opening-day schedule: The City said it would publish the detailed schedule closer to the event.
  • Sponsorship: Naming rights for the aquatic centre, quad gymnasium, walking track and multipurpose rooms were still listed as available.
  • Green certification: The zero-carbon certification is being pursued, not yet confirmed.
  • On-site food: Local restaurant Almadina was selected to run food service. We couldn’t confirm whether it will be open on day one.

Complementary programs and partners

Beyond the building itself, the centre is designed to support a wider community ecosystem:

  • Swim lessons: The City lists the Cowan Aquatics Centre as a place to buy swim tickets, and a City official has said the centre will add about 2,100 swim-lesson spots this fall to help ease waitlists.
  • Local sport groups: More than 30 local organizations (soccer, volleyball, basketball, aquatics, cricket and paddle sports) can expand programs, cut waitlists and host tournaments.
  • Adaptive recreation: The glass floor is built to support wheelchair basketball and wheelchair pickleball once the gym opens.
  • Food: Almadina, a family-run Kitchener business with more than 30 years in the community, will operate on-site food service.
  • Cricket: The Grow Nation Cricket Nets, sponsored by Grow With Nav Inc., add dedicated indoor practice space.
  • Art: Two public art installations tie the building into the city’s arts scene.

The City hasn’t yet published a full schedule of specific programs for the centre. We’ll update this guide as details land.

Plan your visit

  • Where: 1664 Huron Road, RBJ Schlegel Park, Kitchener
  • When: Saturday, November 14, 9 a.m. to 3 p.m. (grand opening)
  • Questions: City of Kitchener, 519-741-2345

Sources: City of Kitchener (Kitchener.ca/crc, the Nov. 14 opening announcement and the Oct. 29 glass floor announcement), ASB GlassFloor press release (Nov. 6, 2026), CTV News Kitchener, Multiplex community newsletters. Photos are stock images from Pexels and are not of the Cowan Recreation Centre.

Scroll to Top